Sign in Subscribe

Sudbury Conservation Commission orders cleanup of unauthorized fill at 900 Concord Road

Conservation Commission · Meeting of August 10, 2026

Sudbury Conservation Commission orders removal of unauthorized concrete fill at 900 Concord Road farm. The commission voted 5-0 on August 10 to issue an enforcement order after new owners brought in recycled concrete debris to stabilize a rutted access road entirely within the floodplain and wetland buffer, a violation in place since April. Doug Dillon of Woodland Sciences, representing the owner, said the material appeared to come from a construction site and called it "really inadequate." The order requires erosion controls, a pre-construction meeting, full removal of the dirty fill, and replacement with stone or other pervious material approved by DPW.

Member Kathleen Rogers questioned Dillon's proposed four-to-six-inch rip-rap as too large, and the commission left final material specification to Coordinator Lori and DPW's Tina. The commission also approved a septic replacement and driveway repaving at 7 Newton Road, consolidating two open orders into one.

In the full story:

  • Who Was There
  • Organizations And Documents Referenced
  • The complete report — 2,354 words

Source: the Conservation Commission meeting of August 10, 2026, reported from the official video recording and transcript.

Keep reading with a 14-day free trial

Subscribe to Middlesex County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Middlesex County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe