Conservation Commission issues orders for two homes, continues 219-unit West Central project

NATICK — June 10, 2026 — Natick Conservation Commission advances 219-unit West Central transit project to July, approves two single-family orders. The commission on June 10 continued the Notice of Intent for Gables Residential's redevelopment of Natick Crossings at 273 West Central St. to July 16 and set a July 7 site walk, after consultant Natty King of Fort Point Associates outlined a five-story, 219-unit building with 258 parking spaces and a net reduction of roughly 8,100 square feet of impervious surface across the 25-foot, 40-foot and 100-foot buffer zones. Commissioner Jeff, citing his commuter familiarity with the rail-side bordering vegetated wetland, called the proposed no-disturb-zone work "threading a needle." The commission also unanimously issued orders of conditions for 56 Beaver Dam Road, which requires a 1,950-square-foot riverfront mitigation planting area, and 104 W. Central St., which requires additional post-demolition soil testing before construction may proceed. A negative three determination was issued for Ted Garland's two-car garage with ADU at 136 South Main St.

Keep reading with a 14-day free trial

Subscribe to Middlesex County News to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Middlesex County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe