Sign in Subscribe

Pepperell DPW board approves minutes, presses solar site on runoff

Board of Public Works · Meeting of August 27, 2026

Pepperell DPW presses a solar developer on stormwater failures near town wells, weighs a $2 million fix for Dirt Jewett Street. Director Paul Brinkman told the Board of Public Works that runoff from the Bemis Solar Project breached its drainage system during August storms, sending mud toward the Bemis well field, which supplies roughly half the town's water; the board set a November 15 stabilization deadline and floated calling in the state DEP. Separately, Brinkman estimated a Dirt Jewett Street boundary survey at $50,000 and full reconstruction at roughly $2 million, saying residents remain split on granting easements.

The board also credited staffer Staci Padovano with cutting delinquent accounts over $2,000 from 115 to 20 in a year, and voted 5-0 to accept June and July meeting minutes.

In the full story:

  • Who Was There
  • Organizations And Documents Referenced
  • The complete report — 3,108 words

Source: the Board of Public Works meeting of August 27, 2026, reported from the official video recording and transcript.

Keep reading with a 30-day free trial

Subscribe to Middlesex County News to keep reading this post and get 30 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

Starting a trial requires a payment method. After 30 free days your subscription begins at the price shown at checkout and renews automatically until you cancel. You can cancel anytime from your account. Subscription terms

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to Middlesex County News

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe